STEP ONE: BUDGET CONSIDERATION

*Our pricing is comparable with most full stone slab cladding applications as a good rule of thumb*

Although we quote on a per project basis, the following acts as a general guide for budget considerations:

Level 1- $100/sq.ft.

Level 2- $125/sq.ft.

Level 3- $150/sq.ft.

Level 4- $175/sq.ft.

Level 5- $200/sq.ft.

Each price level contains our system cost, media selection and installation. Smart lighting will incur additional charges and priced per project. Veining detail(s) and multiple media selections are calculated on a square foot basis.

As an example, if we use 25 square feet as a 'typical' residential kitchen backsplash installation, expectations should be set between $2500-$5000 plus taxes.

We also offer 'contractor rates' to home builders, cabinet companies, renovators, and interior design firms. 

STEP TWO: DISCOVERY CONSULTATION

During our discovery consultation we will review project dimensions, Wall Candy options, media types, surrounding colours and textures, joint locations, clearances, project timelines, and requirements.

STEP THREE: PLACE ORDER

Once we have clearly set out your project parameters, costing, and timelines, we will proceed to placing an order and set a tentative install date.

Once an order is placed it cannot be changed as glass is being cut and materials ordered on a per project basis.

STEP FOUR: SITE PREPARATION

Once an order has been placed, The Wall Candy Co. will be in contact with all other trades pertinent to a successful installation.

This includes the site's home builder or renovator, cabinet designer, electrician, interior designer, etc. to ensure the site is ready for a successful Wall Candy install.

Once the site is ready, The Wall Candy Co. will conduct a final template prior to ordering materials. Any discrepancies found during template will result in a +/- adjustment in final billing.

Our lead time is typically 3-4 weeks from order date.

STEP FIVE: INSTALLATION

Depending on the size and scope of the project, we typically allow a full day to install.

At this point, the countertops have been installed and the site should be clean and free from any debris.

Once complete, your Wall Candy installation receives a final testing, cleaning, and is ready for a final inspection and sign-off.